Solar Megawatts Farm

Large-Scale Solar Power Solutions

Tamil Nadu is one of India’s leading states in solar energy adoption, supported by strong solar irradiation, government policies, and excellent grid infrastructure. Setting up a megawatt-scale solar project is not only a smart financial investment but also a sustainable step toward energy independence.

Vesat Renewables Private Limited specializes in designing, installing, and maintaining megawatt-scale solar power plants for HT consumers, industries, investors, and landowners. We provide complete turnkey EPC solutions from planning to power generation.

Why Choose a Professional EPC Partner?

Choosing the right EPC company is critical for performance, approvals, and long-term returns. Vesat offers:

Expertise in Large-Scale Projects

Execution experience in MW-scale ground-mounted and rooftop solar plants.

TANGEDCO-Compliant Solutions

Support for approvals, grid connectivity, and regulatory processes.

Custom Project Design

Tailored solutions for industrial land, agricultural land, and solar farm development.

Advanced Monitoring & O&M

Smart monitoring systems with remote performance tracking and annual maintenance support.

Land Requirement for Megawatt Solar Plant

Land availability plays a key role in megawatt project planning.

Estimated Land Requirement by Capacity

Note: High-efficiency solar panels (600W and above) can reduce land requirements by 10–15%, while fixed-tilt systems generally require more space compared to tracker-based systems.

Per MW Cost

₹4 Crore – ₹5 Crore per MW (Includes panels, inverters, civil works, electrical infrastructure, and grid connectivity.)

Land & Infrastructure Cost

Land price varies based on location, accessibility, and distance from substation. Civil foundation, mounting structures, and electrical setup form a key part of project cost.

Operation & Maintenance

Annual maintenance ensures consistent performance, higher efficiency, and long system life of 25+ years with stable ROI.

Solar Megawatt Farm Project Cost in Tamil Nadu

The cost of setting up a megawatt-scale solar plant in Tamil Nadu depends on factors like land value, system capacity, technology used, and grid connectivity distance. Proper investment planning ensures better long-term returns and efficient power generation.

 

A typical 1 MW solar project includes expenses for solar panels, inverters, civil works, electrical infrastructure, transmission setup, land (if purchased), and ongoing maintenance. Costs may vary slightly based on location and technical requirements.

ROI of Solar Farm Projects in Tamil Nadu

Solar megawatt projects are high-investment assets designed to generate stable, long-term returns. The overall performance and ROI depend on factors like PPA tariff rates, plant efficiency (CUF), grid connectivity, evacuation readiness, financing structure, and quality of operation & maintenance.

Tamil Nadu offers strong solar generation potential, making it one of the best locations in India for solar farm investments.

Key ROI Highlights

Power Generation

A 1 MW solar plant can produce approx. 14–16 lakh units per year

Payback Period

Typically 5-7 years depending on tariff agreements, location and land cost

Project Lifespan

25–30 years of continuous power generation

Return on Investment

Around 12–16% IRR for well-planned projects

Income & Savings Sources

Power Sales through PPA

Long-term agreements provide steady revenue by selling electricity to DISCOMs or HT consumers

Captive Consumption Savings

Industries can reduce EB bills significantly by using generated power

Renewable Energy Certificates (REC)

Tradable credits for producing clean energy

Carbon Credits

A 1 MW solar plant can offset around 1,500 tons of CO₂ annually, creating additional earning potential

Solar Megawatt Project Installation Process

Setting up a megawatt-scale solar power plant involves a well-planned and systematic approach to ensure maximum performance, safety, and long-term returns. Vesat provides complete turnkey EPC support covering every stage from planning to commissioning.

Key Steps Involved

Careful planning of PV module selection, mounting structures, inverter systems, and electrical layout based on site conditions and energy requirements.

Selection of suitable land that is flat, shadow-free, and well-connected to ensure efficient solar generation and smooth installation.

Integration with the state electricity board for power export, captive consumption, or group captive models with necessary approvals.

Execution of civil works, structure erection, solar panel installation, cabling, safety systems, and final testing before power generation begins.

Benefits of Megawatt Solar Projects

Significant reduction in electricity expenses for HT industries

Long-term income through power sale to grid or private consumers

Tax benefits with accelerated depreciation advantages

25+ years of reliable system lifespan

Low maintenance with stable long-term performance

Strong environmental impact with reduced carbon emissions

Ready to Switch Solar?

Book your free consultation now and discover how much you can save with Vesat Solar’s premium solutions.